The delivery hasn't slipped. The work has outgrown the plan
A due date three months out can stay green while the work beneath it already finishes later. The slip is real; it just lives between the plan and the backlog.
Read article →Jira isn't broken. It's doing its job.
Jira tracks work one team at a time, by design. Whether a group of teams still fits the estimate its plan was built on is a different question, and it needs a different kind of check.
Read article →Two estimates who have never met
The early estimate and the work beneath it live in the same portfolio. What happens when nobody brings the two together?
Read article →A backlog isn't a plan
A backlog records what exists. A plan states what can happen, when, and with which teams. Treating them as the same thing hides work that no forecast accounts for.
Read article →Deriving the t-shirt size from story points tells you nothing
Automating an epic's t-shirt size from its rolled-up story points looks tidy. It makes the high-level estimate and the detail identical, so they can never disagree.
Read article →Why are we still rebuilding the plan after the PI starts?
Once a PI starts, reviewing the ART plan often means rebuilding a spreadsheet first. Capasight brings the group’s work together so reviews can focus on decisions.